New Construction Stage Inspections in Donnybrook

Seven points across a Donnybrook build where the next trade is about to hide the last one. We attend before that happens and measure what is there against the engineering issued for your lot.

  • Any stage, or all seven
  • Attended ahead of the covering trade
  • Checked against the lot engineering
  • Report same or next day
  • Structural items flagged separately
  • Return visits for unresolved work
  • AS 2870 and AS 1684 cited
  • Fitted to the builder's program
Get a price for your Donnybrook inspectionA minute to complete, and you are not committed to anything.

Fully licensed & accredited

The Donnybrook build stages we inspect

The findings here are structural and they are heavy at slab and frame: beams left out, porch posts skew nailed instead of tied down, slab beams obstructed, truss chords cut. None of that is visible once lining goes on.

Frame inspection in Donnybrook

Frame

After frame and trusses are up and the roof is on, before sarking

Beams present and correctly sized, porch post tie-downs, roof bracing extended and bent, truss chords uncut, and the slab to frame relationship

Learn more about the frame inspection →
Sample findings

Sample defects recorded during our construction stage inspections in Donnybrook

One finding per stage from Donnybrook reports, in the inspector's own words.

Internal slab beams obstructed and not continuous, recorded during a slab pre-pour inspection in Donnybrook
Internal slab beams obstructed and not continuous
Beams from the drawings missing at frame stage, recorded during a frame inspection in Donnybrook
Beams from the drawings missing at frame stage
Termite protection breached before lining, recorded during a lock-up inspection in Donnybrook
Termite protection breached before lining
Upper floor window without the required opening restriction, recorded during a fixing inspection in Donnybrook
Upper floor window without the required opening restriction
Metal fascia and gutter damaged before handover, recorded during a fixing inspection in Donnybrook
Metal fascia and gutter damaged before handover
Mixer and pipework leaking at practical completion, recorded during a pre-handover inspection in Donnybrook
Mixer and pipework leaking at practical completion
Porch post tie-down inadequate for the load it carries, recorded during a frame inspection in Donnybrook
Porch post tie-down inadequate for the load it carries
Owner Inspections inspectors going through a report
Why Donnybrook owners choose us

Independent. Licensed. Insured.

  • Your Donnybrook report is written and signed by whoever stood on the site.
  • Findings are cited to AS 2870, AS 1684, AS 3740 or the Guide to Standards and Tolerances 2015.
  • We work to the engineering issued for your lot, not to a generic checklist.
  • The inspector's mobile stays on the report for as long as your build runs.
Guides

New Construction Stage Inspections guides for Donnybrook

All guides →

Book new construction stage inspections in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

New Construction Stage Inspections in Donnybrook: common questions

Which Donnybrook stages carry the most weight?

Slab and frame. Nearly every structural item recorded on Donnybrook jobs sits at one of those two, because that is where the load path is fixed and where nothing can be revisited.

What is beyond the scope of a stage inspection?

Our inspectors work visually and by hand. Electrical work is not energised or tested, plumbing is not pressure tested, nothing is opened up destructively, no engineering is certified and no soil is sampled. Those belong to the licensed trades, the engineer and the building surveyor.

How much warning do you need?

A day or two is usually workable. Let us know the moment the supervisor confirms, since these dates shift constantly.