Donnybrook Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-Handover (PCI) Inspections in Donnybrook

The walk through before you take keys, written down properly. Every unfinished, damaged or out of tolerance item goes on a numbered list while the builder still has to fix it at their cost.

  • Numbered list, room by room
  • Written for the builder to action
  • Each item tied to a clause or tolerance
  • Back with you inside a day
  • Scheduled against your handover date
  • Return visit before settlement
  • Code items separated from cosmetic
  • Inspector reachable afterwards
Get a price for your Donnybrook inspectionA minute to complete, and you are not committed to anything.

Fully licensed & accredited

What is included

What is included in a Donnybrook pre-handover (PCI) inspection

A Donnybrook pre-handover inspection is assessed against your contract and selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.

0 checkpoints across 0 areas on a standard Donnybrook pre-handover (PCI) inspection. Where something is locked, sealed or buried under stored material on the day, it goes in the report as not inspected. We never mark unreachable work as satisfactory.

Sample findings

Sample defects recorded during our pre-handover (PCI) inspections in Donnybrook

Straight from Donnybrook practical completion reports.

Damp proof course not visible where the code requires, recorded during a pre-handover inspection in Donnybrook
Damp proof course not visible where the code requires
Weep holes at a different height from the approved drawings, recorded during a pre-handover inspection in Donnybrook
Weep holes at a different height from the approved drawings
Slab cracking at 2mm to 4mm, beyond the tolerance, recorded during a pre-handover inspection in Donnybrook
Slab cracking at 2mm to 4mm, beyond the tolerance
Mixer and pipework leaking at inspection, recorded during a pre-handover inspection in Donnybrook
Mixer and pipework leaking at inspection
Ducts loose or not connected in the roof space, recorded during a pre-handover inspection in Donnybrook
Ducts loose or not connected in the roof space
Site grading incomplete at practical completion, recorded during a pre-handover inspection in Donnybrook
Site grading incomplete at practical completion
Broken and cracked roof tiles needing replacement, recorded during a pre-handover inspection in Donnybrook
Broken and cracked roof tiles needing replacement
Cracked and chipped floor tiles requiring replacement, recorded during a pre-handover inspection in Donnybrook
Cracked and chipped floor tiles requiring replacement
Tears and rips through the roof sarking, recorded during a pre-handover inspection in Donnybrook
Tears and rips through the roof sarking
Sealant degraded with sections missing, recorded during a pre-handover inspection in Donnybrook
Sealant degraded with sections missing
Owner Inspections inspectors going through a report
Why Donnybrook owners choose us

Independent. Licensed. Insured.

  • Your Donnybrook report is written and signed by whoever stood on the site.
  • Findings are cited to AS 2870, AS 1684, AS 3740 or the Guide to Standards and Tolerances 2015.
  • We work to the engineering issued for your lot, not to a generic checklist.
  • The inspector's mobile stays on the report for as long as your build runs.
Guides

Pre-Handover (PCI) Inspections guides for Donnybrook

All guides →

Book pre-handover (pci) inspections in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Donnybrook: common questions

How far ahead of handover should this be booked?

Around a week. That leaves room for us to attend, write it up, and for you to put the list in front of the builder before signing anything.

What is beyond the scope of a pre-handover inspection?

Circuits are not energised, plumbing is not pressure tested, heating and cooling are not commissioned, appliances and automatic garage door safety systems are not tested, and concealed framing or anything blocked by stored goods is not inspected. Those belong with the licensed trades and the certifier.

Do code issues really turn up this late?

They do here. Damp proof courses hidden from view and weep holes at the wrong height have both been recorded on Donnybrook handovers, and neither is a finish issue.

CallGet a Free Quote