Where the engineering specifies piers, the only chance to check them is between boring and concrete.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Building & Plumbing Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Pockets of the northern corridor carry fill and variable ground. Where piers are specified, the depth on the drawing is the figure that has to be achieved.
Annotated findings from Bored piers inspections.

2Slab pre-pourThe day before the pour, with pods, steel and formwork still open
3FrameAfter frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)Once roof, cladding and external doors are on, before plaster arrives
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingOnce the membrane is on and cured, before tiling starts
7Pre-handover (PCI)About a week ahead of your practical completion dateInstant online pricing for Donnybrook, or contact the booking team.
Under an hour on a standard residential lot.
Then there is nothing to inspect. This is the most time critical stage on the list.
No. We report against the drawing. Certification belongs to the engineer.
No, many are a waffle raft slab with none at all.
Your engineering drawing and AS 2870.
It is a good one to attend, since everything is still open to view.