Donnybrook Building
Inspections

Why continuous slab beams matter in Donnybrook

Obstructed internal beams and short reinforcement laps.

Owner Inspections · Donnybrook 3064 · 2026-05-21

In short: A slab beam that is not continuous is not doing what the engineer designed.

Internal beams

They stiffen and span the slab. Obstructed and discontinuous beams have been recorded on Donnybrook pours.

Reinforcement laps

Laps shorter than the minimum break the continuity the steel exists to provide.

Step reinforcement

Where a step exceeds 200mm the engineering calls for extensions. We have found them absent.

Bar chairs

They hold the steel at the designed height. Too few and the cover is wrong.

Safety on the deck

Uncapped star pickets and reo bar ends are an impalement risk for anyone working there.

Written by the Owner Inspections team from inspections carried out in Donnybrook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Donnybrook

All guides →

Book a building inspection in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Donnybrook owners ask about this

How long is the inspection?

About an hour.

Can it wait until after the pour?

No.

Do you test concrete?

No, that is the batching plant.

Standard?

AS 2870 with your engineering.